Wednesday, July 14. 2021
FERC, NERC Release Joint Report on Real-time Assessments of Grid Operating Conditions
The publication addresses seven technical areas associated with real-time assessments, with special attention given to five central matters and goals:
- established verification procedures to ensure that models are accurate and consistent
- maintained awareness of changes/upgrades to tools
- sustained situational awareness when tools are affected
- guaranteed actions are known and consistent in timing and scope
- prepared feasible, accurate backup plans with related training programs
The review assesses system conditions utilizing real-time data to measure current and potential operating conditions to guarantee ongoing, dependable operation of the bulk electric system. The combined staff evaluation concentrates on methods used by transmission operators and reliability coordinators when conducting these assessments after a loss or deterioration of data or tools used to maintain situational awareness. Also featured in the review were in-person discussions with representatives of nine participating reliability coordinators and transmission operators.
For more information, contact either Kimberly Mielcarek, NERC, at kimberly.mielcarek@nerc.net or Mary O’Driscoll, Director, Media Relations, FERC, by phone at (202) 502-8680 or via email at mediadl@ferc.gov.
Sources:
FERC, NERC, Regional Entity Staff Make Recommendations For Grid Operating Assessments (ferc.gov)
FERC and ERO Enterprise Joint Report on Real-time Assessments (ferc.gov)